substation

33KV HYDROPOWER PROJECTS IN NEPAL

Project name: 10MW HYDROPOWER PROJECT

Country of the project: Nepal

Project Description: Supply of 33kV composite insulators and hardware fittings strings

Time of delivery: 2019

Shenyang Tronco Electric Co., Ltd made the design, manufacture, and supply of the components of the tension insulator strings. The tension string is including a clevis to be fixed on the tower, two anchor shackles to connect the clevis and a composite insulator with tongue and clevis design, another anchor shackle, and bolted type aluminum alloy tension clamp. The joint sleeve compression type for ACSR Lynx was also supplied for this project.