30KV LINES IN RWANDA

Project name: 11.07.053/399/16/PROC-EDCL/MD/EK/ug

Country of the project: Rwanda

Project Description: DESIGN, SUPPLY ERECTION, and COMMISSIONING of Lot 3, 30kV lines Rulindo-Byumba-Gatuna and Byumba-Ngarama

Time of delivery: 2016


Single suspension, single tension, and double suspension insulator strings were supplied for this project, The connection components are U-bolt, Eye link, Suspension clamp, insulators, tension clamp, etc. The insulator strings have passed third-party inspection before shipping.


Porcelain insulators